svg Нижний Новгород,ул. Федосеенко 6
svg Monday - Friday: 8.00 - 18.00

Flat roof

Installation

Spanizol D material: when installing roofs the material is rolled out and cut on the roof rafters. Installation is carried out from bottom to top with horizontal sheets with overlap of 15 cm. The material is fastened with 4×5 cm battens covered with antiseptic on the nails or self-tapping screws.  When installing floors on the concrete base, the material is laid on the slab with overlap of 15 cm, and when waterproofing the floor under bonded screed, it is necessary to bring the material onto the walls at least 10 cm. Due to additives of UV stabilizer to the Spanizol D material it can be used as temporary roof for at least 3 months.

Other products

  • Heat-insulated frame wall

    Sectional elevation (longitudinal, vertical) Installation Super diffusion membrane Spanizol Premium AS, AM, A120: it can be installed directly on the insulant (with

  • Cold pitched roof

    Cold pitched roof Hydro-vapor insulation Spanizol D: when installing roofs the material is rolled out and cut on the roof rafters. Installation